Casting Application
Investment Casting, Gravity Casting, Die Casting, Sand Casting
Investment Casting Process
We Provide PRO-Cast Simulation, Design and Consulting Services!
WAX Process
The only mass-production wax mold automatic assembly system in Asia.
Shell Process
- DSA infrared rapid drying system can complete the drying in only 6 hours! Compared to the traditional shell mold drying process that takes 50 hours!
- Ensures stability of the cast parts' dimensions, weight, and quality.
The world’s only mass-production rapid drying shell mold system, with over ten years of factory production verification.
Mass Production Shell Mold Flexible Manufacturing System
- A user-friendly human-machine interface system provides operators with a simplified platform.
- Web Interface: Enables production line status monitoring throughout the facility.
- Equipment Health Check and Alerts: Supports maintenance personnel in keeping equipment in optimal condition.
- Fault History Analysis: Helps identify frequent failures and areas with longer repair times, enabling adjustments to maintenance SOPs and improving equipment performance.
- Material Tracking and Recording: Enables production management to monitor key aspects of shell mold production and control errors when quality issues arise.
- Production History Recording: RFID tagging of shell molds facilitates tracking of subsequent process history.
- Access Control: Ensures process parameters are protected from unauthorized modifications and safeguards critical process data.
- Key Information: Assists operators in verifying production status.
- Process Parameter Management: Configures detailed action workflows.
- Production Management: Displays production status.
- User-Friendly Query Interface